Skip to main content
Corvus
FAQ

How long does a concrete scan take?

A typical pre-drill scan on a small area takes 1–2 hours on site, with marks on the slab before we leave and the written report within 5 working days. Larger reinforcement-mapping or PT scans usually take a full day on site.

A typical pre-drill scan on a small area takes 1–2 hours on site, with marks on the slab before we leave and the written report within 5 working days. Larger reinforcement-mapping or PT scans usually take a full day on site.

The full answer is in our article How long does a GPR survey take.

Ready to see what's beneath the surface?

Tell us what you're working on. We call back the same working day with a method and a date in the diary.

Call 020 3886 3660 Get a Quote